Week 3 Construction Update Week Ending June 20
Posted: June 24, 2025 • Category: Construction and Improvements
Crews are continuing to work at an efficient pace.
- Majority of the existing deterioration on slab edges have been demoed, cleaned and coated. Slab repair areas will continue pending engineer approval and should be completed soon.
- All stucco on columns have had stucco stripped for inspection. Shoring of the columns is under way and will continue this week.
- Engineer to be on site this week to keep things rolling. Column work will begin after inspections are completed.
All in all, the project is going as planned. We look to continue at our current pace.
Below is the live link to the One Drive:
Pictures have been uploaded of the D Building. The link will be updated as more pictures are taken.