Building Features

Construction progress at the Private Beach continues as crews work on both interior and exterior features. Elevators are currently being installed and tested, while underground electrical wiring is underway. On the second floor, tile installation is nearing completion. The elevator lobby features wave tile complemented by blue glass accent tiles. Bathroom finishes are in progress. Ceiling beams have been installed, with the tongue-and-groove ceiling still pending. Cabinets have been installed in the catering kitchen. Landscaping is maturing, with Clusia plants added around the barbecue areas to enhance privacy. The parking lot is to be paved and striped soon. The remaining finishing touches are in progress as the project moves steadily towards the final inspections beginning in July for an anticipated opening in August.

(Photos and video taken on June 13, 2025)

Contractor’s Corner

Click on the video below to hear from our contractor, Robert D’Angelo.
https://vimeo.com/1093225990

Drone Footage
https://vimeo.com/1093225990

Exterior of the Building

The landscaping is gradually maturing and taking on its full form.
The landscaping is gradually maturing and taking on its full form.

Side view of the Private Beach facility.
Side view of the Private Beach facility.

The crew is preparing the barbecue area for stucco.
The crew is preparing the barbecue area for stucco.

Clusia plants have been planted around the barbecue area for privacy.
Clusia plants have been planted around the barbecue area for privacy.

First Floor of the Building

Stuccoed access panels for motorized screens and hurricane shutters are pending paint and installation.

Stuccoed access panels for motorized screens and hurricane shutters are pending paint and installation.

The elevators are being installed and tested.
The elevators are being installed and tested.

Second Floor of the Building

Wave tile wall and blue accent tile in the second floor elevator lobby.

Wave tile wall and blue accent tile in the second floor elevator lobby.

Ceiling beams are installed, with the tongue-and-groove ceiling pending.
Ceiling beams are installed, with the tongue-and-groove ceiling pending.

One of three reels of electrical wire being installed underground.
One of three reels of electrical wire being installed underground.

Work in the catering kitchen is advancing, including cabinet installation.
Work in the catering kitchen is advancing, including cabinet installation.